Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0251 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,713 | $3,862 | Implemented |
MO0251 # 06 Y:1999 | 06 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $15,502 | $17,960 | Implemented |
UD0568 # 01 Y:1999 | 01 | 1999 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $8,393 | $3,600 | Not Implemented |
UD0568 # 02 Y:1999 | 02 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $5,475 | $7,000 | Not Implemented |
UD0568 # 03 Y:1999 | 03 | 1999 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $5,171 | $4,000 | Implemented |
UD0568 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,154 | $2,000 | Not Implemented |
UF0223 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,463 | $0 | Not Implemented |
UF0223 # 02 Y:1999 | 02 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,615 | $50 | Implemented |
UF0223 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $654 | $0 | Implemented |
UF0223 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,583 | $9,021 | Implemented |
UF0223 # 05 Y:1999 | 05 | 1999 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,250 | $0 | Implemented |
UF0223 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $28,563 | $100,600 | Implemented |
WV0163 # 07 Y:1999 | 07 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $740 | $420 | Not Implemented |
WV0163 # 08 Y:1999 | 08 | 1999 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,619 | $3,500 | Not Implemented |
WV0163 # 09 Y:1999 | 09 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,854 | $1,075 | Implemented |
WV0163 # 10 Y:1999 | 10 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $49,719 | $11,000 | Implemented |
WV0163 # 11 Y:1999 | 11 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,950 | $0 | Implemented |
WV0163 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,038 | $30 | Not Implemented |
WV0163 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,261 | $132 | Implemented |
WV0163 # 03 Y:1999 | 03 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,997 | $1,290 | Implemented |
WV0163 # 04 Y:1999 | 04 | 1999 | BURN A LESS EXPENSIVE GRADE OF FUEL | $4,974 | $6,400 | Not Implemented |
WV0163 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $3,844 | $390 | Implemented |
WV0163 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $947 | $616 | Not Implemented |
UM0138 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,289 | $0 | Implemented |
UM0138 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $408 | $300 | Implemented |