IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0485 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $354 $840 Not Implemented
TA0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,915 $975 Not Implemented
TA0091 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,600 $4,390 Not Implemented
TA0091 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,910 $2,332 Not Implemented
TA0091 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,750 $190 Not Implemented
TA0091 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $892 $117 Not Implemented
TA0091 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $520 $15 Not Implemented
SU0205 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,784 $0 Implemented
SU0205 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,184 $0 Not Implemented
SU0205 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,803 $75 Implemented
SU0205 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,271 $560 Not Implemented
SU0205 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $5,926 $1,000 Implemented
SU0205 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $822 $1,010 Implemented
SU0205 # 07 Y:2005 07 2005 ADOPT IN-HOUSE MATERIAL GENERATION $2,182,664 $3,516,395 Not Implemented
AM0482 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $50,000 $2,000 Implemented
AM0482 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,940 $500 Implemented
AM0482 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,210 $0 Implemented
AM0482 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,020 $0 Implemented
AM0482 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $0 Implemented
AM0482 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $280 $50 Not Implemented
AM0482 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $605 $350 Implemented
AS0394 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,769 $3,632 Not Implemented
AS0394 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,219 $1,000 Not Implemented
AS0394 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,961 $321 Not Implemented
AS0394 # 04 Y:2005 04 2005 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $71,792 $33,000 Not Implemented