IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0088 # 04 Y:1997 04 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $4,800 $243 n/a
KG0088 # 05 Y:1997 05 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,231 $0 n/a
KG0088 # 06 Y:1997 06 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $312 $0 n/a
KG0088 # 07 Y:1997 07 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,414 $14,190 n/a
GT0611 # 01 Y:1997 01 1997 REDUCE VENTILATION AIR $6,440 $7,500 Implemented
GT0611 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $1,430 $3,000 Not Implemented
GT0611 # 03 Y:1997 03 1997 REDUCE VENTILATION AIR $2,710 $1,500 Implemented
GT0611 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,050 $14,205 Not Implemented
GT0611 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $250 Implemented
GT0611 # 06 Y:1997 06 1997 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $6,239 $22,000 Not Implemented
GT0611 # 07 Y:1997 07 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,000 $0 Not Implemented
GT0611 # 08 Y:1997 08 1997 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $10,300 $3,750 Implemented
GT0611 # 09 Y:1997 09 1997 METER WASTE WATER $870 $500 Implemented
HO0155 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,138 $9,401 Not Implemented
HO0155 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,489 $1,607 Implemented
HO0155 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,556 $1,000 Implemented
HO0155 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,298 $15,334 Not Implemented
HO0155 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,141 $2,400 Not Implemented
HO0155 # 06 Y:1997 06 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,462 $6,000 Not Implemented
HO0155 # 07 Y:1997 07 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,263 $1,363 Implemented
HO0155 # 08 Y:1997 08 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $5,460 $25,000 Implemented
BD0082 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $6,539 $2,500 Implemented
BD0082 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,024 $8,880 Implemented
BD0082 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $1,748 $1,125 Not Implemented
BD0082 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $553 Implemented