Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0318 # 06 Y:2002 | 06 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $516,637 | $100,000 | Implemented |
UD0639 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,669 | $17,123 | Not Implemented |
UD0639 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $2,052 | Implemented |
UD0639 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $450 | $1,698 | Implemented |
UD0639 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $418 | $0 | Implemented |
WI0413 # 01 Y:2002 | 01 | 2002 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $27,075 | $130,000 | Not Implemented |
WI0413 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,951 | $3,762 | Not Implemented |
WI0413 # 03 Y:2002 | 03 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,493 | $600 | Not Implemented |
WI0413 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $6,626 | $26,500 | n/a |
WI0413 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,732 | $25,405 | n/a |
WI0413 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $928 | $640 | Implemented |
SU0131 # 01 Y:2002 | 01 | 2002 | CHANGE PRODUCT SPECS | $14,930 | $2,500 | Not Implemented |
SU0131 # 02 Y:2002 | 02 | 2002 | ELIMINATE/REDUCE AN OPERATION | $2,391 | $115 | Not Implemented |
SU0131 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $997 | $102 | Implemented |
SU0131 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $917 | $115 | Not Implemented |
SU0131 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $775 | $193 | Implemented |
SU0131 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $197 | $0 | Not Implemented |
UF0293 # 01 Y:2002 | 01 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,692 | $12,162 | n/a |
UF0293 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,940 | $30,000 | n/a |
UF0293 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,684 | $23,130 | n/a |
UF0293 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,852 | $550 | n/a |
UF0293 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,029 | $3,500 | n/a |
UF0293 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $4,753 | n/a |
UF0293 # 07 Y:2002 | 07 | 2002 | MOVE BOILER TO MORE EFFICIENT LOCATION | $1,449 | $0 | n/a |
UF0293 # 08 Y:2002 | 08 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $11,069 | $50,413 | n/a |