IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0461 # 06 Y:2000 06 2000 SELL COMBUSTIBLE WASTE $330 $0 Not Implemented
ME0288 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,377 $0 Implemented
ME0288 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,781 $15,835 Not Implemented
ME0288 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,432 $590 Implemented
ME0288 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,482 $14,072 Implemented
ME0288 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $4,832 $9,423 Implemented
ME0288 # 06 Y:2000 06 2000 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $3,459 $10,000 Not Implemented
ME0288 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,023 $3,500 Implemented
ME0288 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,525 $2,000 Implemented
ME0288 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $46,375 $0 Not Implemented
ME0288 # 10 Y:2000 10 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,000 $3,500 Not Implemented
MS0156 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,264 $583 Not Implemented
MS0156 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,681 $200 Implemented
MS0156 # 03 Y:2000 03 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,566 $0 Not Implemented
MS0156 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $74,209 $6,000 Implemented
TP0015 # 01 Y:2000 01 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,906 $600 Implemented
TP0015 # 02 Y:2000 02 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,404 $6,200 Not Implemented
TP0015 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,255 $509 Implemented
TP0015 # 04 Y:2000 04 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,092 $0 Implemented
TP0015 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,056 $0 Implemented
TP0015 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $566 $3,147 Not Implemented
TP0015 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $634 Not Implemented
TP0015 # 08 Y:2000 08 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $455 $84 Not Implemented
TP0015 # 09 Y:2000 09 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $334 $301 Not Implemented
OD0155 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,185 $26,708 Implemented