Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0874 # 07 Y:2023 | 07 | 2023 | USE PHOTOCELL CONTROLS | $1,050 | $960 | Implemented |
LT8367 # 01 Y:2023 | 01 | 2023 | TREAT AND REUSE RINSE WATERS | $53,474 | $5,948 | Not Implemented |
LT8367 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,629 | $335,972 | Implemented |
LT8367 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,506 | $3,722 | Implemented |
LT8367 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $209 | $343 | Implemented |
LT8367 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $519 | $332 | Not Implemented |
LE0542 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,677 | $3,000 | Not Implemented |
LE0542 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,690 | $37,053 | Not Implemented |
LE0542 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,207 | $1,900 | Implemented |
LE0542 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,492 | $12,810 | Implemented |
LE0542 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,898 | $60,000 | Not Implemented |
SF0597 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,268 | $0 | Implemented |
SF0597 # 02 Y:2023 | 02 | 2023 | ADD AREA LIGHTING SWITCHES | $11,388 | $100 | Implemented |
SF0597 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $53,882 | $13,192 | Implemented |
SF0597 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $706 | $200 | Not Implemented |
SF0597 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,164 | $2,251,041 | Implemented |
UU0217 # 01 Y:2023 | 01 | 2023 | Install Anaerobic Digester | $648,030 | $7,400,000 | Implemented |
UU0217 # 02 Y:2023 | 02 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,500 | $51,330 | Implemented |
UU0217 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,807 | $8,910 | Implemented |
UU0217 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,013 | $1,020 | Implemented |
UU0217 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,794 | $5,550 | Not Implemented |
TT0289 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,836 | $40 | Implemented |
TT0289 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,365 | $1,405 | Implemented |
TT0289 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,799 | $2,000 | Not Implemented |
TT0289 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,798 | $13,000 | Implemented |