IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,907

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0302 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $376 $0 Not Implemented
IC0302 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,613 $0 Not Implemented
IC0302 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,025 $350 Implemented
IC0302 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $320 $0 Not Implemented
IC0302 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,385 $1,118 Implemented
IC0302 # 09 Y:2024 09 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,215 $4,414 Not Implemented
IC0302 # 10 Y:2024 10 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,478 $12,801 Not Implemented
LS0324 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $2,912 $175 Implemented
LS0324 # 02 Y:2024 02 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,003 $1,360 Implemented
LS0324 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,954 $13,620 Implemented
IP0188 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $191,070 $2,400 Not Implemented
IP0188 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $27,927 $2,500 Not Implemented
IP0188 # 03 Y:2024 03 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,000 $650 Not Implemented
IP0188 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,293 $2,560 Not Implemented
IP0188 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,737 $750 Not Implemented
IP0188 # 06 Y:2024 06 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,621 $438 Not Implemented
IP0188 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,671 $49 Not Implemented
IP0188 # 08 Y:2024 08 2024 USE RADIANT HEATER FOR SPOT HEATING $4,200 $5,429 Not Implemented
IP0188 # 09 Y:2024 09 2024 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $1,660 $947 Not Implemented
AM0908 # 01 Y:2024 01 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $210,130 $2,300,000 n/a
AM0908 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $182,340 $400,000 n/a
AM0908 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,000 $1,583,300 n/a
AM0908 # 04 Y:2024 04 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $10,125 $25,600 n/a
AM0908 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $47,600 $59,770 n/a
AM0908 # 06 Y:2024 06 2024 REPAIR OR REPLACE STEAM TRAPS $9,410 $630 n/a