IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0079 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $60 Implemented
NC0079 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,578 $1,200 Not Implemented
NC0079 # 04 Y:1996 04 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,117 $3,000 Not Implemented
NC0079 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $6,000 Not Implemented
NC0079 # 06 Y:1996 06 1996 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,641 $6,000 Not Implemented
NC0079 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,705 $2,500 Not Implemented
NC0079 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,851 $200 Not Implemented
IA0143 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $640 Implemented
IA0143 # 02 Y:1996 02 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,401 $1,128 Not Implemented
IA0143 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,672 $463 Implemented
IA0143 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $282 $25 Implemented
IA0143 # 05 Y:1996 05 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $27,825 $54,500 Implemented
IA0143 # 06 Y:1996 06 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $5,446 $16,125 Not Implemented
AS0172 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,958 $31,028 Not Implemented
AS0172 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $418 $960 Not Implemented
AS0172 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $1,398 $1,650 Implemented
AS0172 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,057 $840 Implemented
AS0172 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,118 $0 Implemented
AS0172 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,671 $960 Implemented
AS0172 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,903 $34,100 Implemented
AS0172 # 08 Y:1996 08 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,874 $38,200 Not Implemented
AS0172 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,620 $8,092 Not Implemented
AS0172 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,393 $0 Not Implemented
UM0055 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $5,129 $17,603 Not Implemented
UM0055 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,553 $4,800 Not Implemented