IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0678 # 07 Y:2000 07 2000 ADD AREA LIGHTING SWITCHES $1,320 $2,660 Not Implemented
TN0678 # 08 Y:2000 08 2000 REDUCE EXCESS STEAM BLEEDING $350 $170 Implemented
TN0678 # 09 Y:2000 09 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $277 $0 Implemented
WV0188 # 01 Y:2000 01 2000 INSTALL SET-BACK TIMERS $318 $28 Implemented
WV0188 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $24 $62 Implemented
WV0188 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $15 Implemented
WV0188 # 04 Y:2000 04 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $270 $150 Implemented
WV0188 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $3,746 $3,344 Implemented
WV0188 # 06 Y:2000 06 2000 DISCONNECT BALLASTS $5,102 $1,527 Implemented
WV0188 # 07 Y:2000 07 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,937 $0 Not Implemented
WV0188 # 08 Y:2000 08 2000 USE OPTIMUM THICKNESS INSULATION $73 $176 Not Implemented
WV0188 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $693 Implemented
WV0188 # 10 Y:2000 10 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,187 $0 Implemented
WV0188 # 11 Y:2000 11 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $44 $0 Not Implemented
WV0188 # 12 Y:2000 12 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,344 $336 Not Implemented
WV0188 # 13 Y:2000 13 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $6,000 Not Implemented
SD0242 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,399 $1,960 Implemented
SD0242 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,283 $3,000 Not Implemented
SD0242 # 03 Y:2000 03 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,568 $0 Not Implemented
SD0242 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,903 $0 Implemented
SD0242 # 05 Y:2000 05 2000 CONVERT TO ELECTROSTATIC POWDER COATING $42,700 $58,000 Not Implemented
SD0242 # 06 Y:2000 06 2000 CONVERT TO AQUEOUS CLEANING SYSTEM $8,347 $0 Not Implemented
SD0242 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,533 $8,500 Implemented
SD0242 # 08 Y:2000 08 2000 RECYCLE WHITE WATER $313 $400 Not Implemented
SD0242 # 09 Y:2000 09 2000 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $2,431 $3,294 Not Implemented