IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0672 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,550 $4,730 Not Implemented
OK0902 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,929 $24,297 Not Implemented
OK0902 # 02 Y:2015 02 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $739 $468 Implemented
OK0902 # 03 Y:2015 03 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,033 $14,760 Not Implemented
OK0902 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,160 $2,367 Not Implemented
OK0902 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $1,358 $3,750 Not Implemented
OK0902 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,781 $8,612 Not Implemented
OK0902 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,028 $3,948 Not Implemented
OK0902 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $316 $329 Not Implemented
OK0902 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $441 $1,262 Not Implemented
OK0902 # 10 Y:2015 10 2015 RECOVER WASTE HEAT FROM EQUIPMENT $524 $1,220 Not Implemented
OK0902 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $904 $520 Implemented
OK0902 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $44,461 $58,968 Implemented
OK0902 # 13 Y:2015 13 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,188 $144,447 Implemented
OK0902 # 14 Y:2015 14 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $520 $1,320 Implemented
OK0902 # 15 Y:2015 15 2015 REDUCE HEAT GAIN BY WINDOW TINTING $5,118 $43,272 Not Implemented
NC0533 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,228 $6,494 Implemented
NC0533 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $253 $600 Implemented
NC0533 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $567 $100 Not Implemented
NC0533 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $751 $3,000 Not Implemented
NC0533 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $384 $100 Implemented
NC0533 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $254 $450 Implemented
NC0533 # 07 Y:2015 07 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $571 $2,500 Not Implemented
NC0532 # 01 Y:2015 01 2015 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $48,749 $105,000 Not Implemented
NC0532 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,143 $73,960 Implemented