Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0672 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,550 | $4,730 | Not Implemented |
OK0902 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,929 | $24,297 | Not Implemented |
OK0902 # 02 Y:2015 | 02 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $739 | $468 | Implemented |
OK0902 # 03 Y:2015 | 03 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,033 | $14,760 | Not Implemented |
OK0902 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,160 | $2,367 | Not Implemented |
OK0902 # 05 Y:2015 | 05 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $1,358 | $3,750 | Not Implemented |
OK0902 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,781 | $8,612 | Not Implemented |
OK0902 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,028 | $3,948 | Not Implemented |
OK0902 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $316 | $329 | Not Implemented |
OK0902 # 09 Y:2015 | 09 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $441 | $1,262 | Not Implemented |
OK0902 # 10 Y:2015 | 10 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $524 | $1,220 | Not Implemented |
OK0902 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $904 | $520 | Implemented |
OK0902 # 12 Y:2015 | 12 | 2015 | INSULATE BARE EQUIPMENT | $44,461 | $58,968 | Implemented |
OK0902 # 13 Y:2015 | 13 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $48,188 | $144,447 | Implemented |
OK0902 # 14 Y:2015 | 14 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $520 | $1,320 | Implemented |
OK0902 # 15 Y:2015 | 15 | 2015 | REDUCE HEAT GAIN BY WINDOW TINTING | $5,118 | $43,272 | Not Implemented |
NC0533 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,228 | $6,494 | Implemented |
NC0533 # 02 Y:2015 | 02 | 2015 | USE PHOTOCELL CONTROLS | $253 | $600 | Implemented |
NC0533 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $567 | $100 | Not Implemented |
NC0533 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $751 | $3,000 | Not Implemented |
NC0533 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $384 | $100 | Implemented |
NC0533 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $254 | $450 | Implemented |
NC0533 # 07 Y:2015 | 07 | 2015 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $571 | $2,500 | Not Implemented |
NC0532 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $48,749 | $105,000 | Not Implemented |
NC0532 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,143 | $73,960 | Implemented |