IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0028 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,880 $53,000 Not Implemented
LM0028 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,807 $800 Implemented
LM0028 # 05 Y:2002 05 2002 INSTALL SKYLIGHTS $5,597 $10,400 Not Implemented
LM0028 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,289 $14,371 Not Implemented
LM0028 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $147,649 $242,050 Not Implemented
LM0028 # 08 Y:2002 08 2002 MODIFY WORKLOAD $202,176 $2,200 Implemented
LM0028 # 09 Y:2002 09 2002 INSTALL SYSTEM TO COLLECT SCRAP $23,190 $13,500 Not Implemented
LM0028 # 10 Y:2002 10 2002 DEVELOP STANDARD OPERATING PROCEDURES $15,600 $1,780 Not Implemented
IA0286 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,555 $434 Implemented
IA0286 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,616 $250 Implemented
IA0286 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,022 $25 Not Implemented
IA0286 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,353 $3,186 Not Implemented
IA0286 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,465 $16,361 Implemented
IA0286 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $0 Implemented
IA0286 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,270 $1,500 Implemented
IA0286 # 08 Y:2002 08 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $2,691 $1,000 Implemented
IA0286 # 09 Y:2002 09 2002 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,570 $3,500 Not Implemented
IA0286 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,028 $2,680 Not Implemented
IA0286 # 11 Y:2002 11 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $-1,412 $80,000 Not Implemented
MA0507 # 01 Y:2002 01 2002 ADOPT IN-HOUSE MATERIAL GENERATION $69,744 $194,100 Implemented
MA0507 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,237 $40,000 Not Implemented
MA0507 # 03 Y:2002 03 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,940 $4,000 Not Implemented
MA0507 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $35,500 Not Implemented
MA0507 # 05 Y:2002 05 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $795 $3,230 Implemented
MA0507 # 06 Y:2002 06 2002 PAY BILLS ON TIME TO AVOID LATE FEES $576 $0 Implemented