Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0532 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $773 | $240 | Implemented |
NC0532 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $353 | $438 | Implemented |
NC0532 # 05 Y:2015 | 05 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $18,636 | $45,000 | Implemented |
NC0532 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $17,917 | $8,000 | Not Implemented |
NC0532 # 07 Y:2015 | 07 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,753 | $1,620 | Implemented |
NC0532 # 08 Y:2015 | 08 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $990 | $450 | Implemented |
NC0532 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,703 | $500 | Not Implemented |
NC0532 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,952 | $100 | Not Implemented |
NC0532 # 11 Y:2015 | 11 | 2015 | REDUCE FLUID FLOW RATES | $8,338 | $5,000 | Not Implemented |
NC0532 # 12 Y:2015 | 12 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,924 | $1,935 | Not Implemented |
OR0642 # 01 Y:2015 | 01 | 2015 | MODIFY STARTUP/SHUTDOWN TIMES | $6,091 | $44,052 | Implemented |
OR0642 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,013 | $24,232 | Implemented |
OR0642 # 03 Y:2015 | 03 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $46,293 | $100,000 | Not Implemented |
OR0642 # 04 Y:2015 | 04 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,825 | $22,383 | Not Implemented |
OR0642 # 05 Y:2015 | 05 | 2015 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,833 | $500 | Implemented |
OR0642 # 06 Y:2015 | 06 | 2015 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $64,347 | $61,077 | Not Implemented |
OR0642 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $898 | $2,015 | Implemented |
BD0454 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,230 | $20 | Not Implemented |
BD0454 # 02 Y:2015 | 02 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,872 | $3,000 | Not Implemented |
BD0454 # 03 Y:2015 | 03 | 2015 | USE SYNTHETIC LUBRICANT | $2,717 | $1,400 | Not Implemented |
BD0454 # 04 Y:2015 | 04 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,875 | $1,450 | Not Implemented |
BD0454 # 05 Y:2015 | 05 | 2015 | USE PHOTOCELL CONTROLS | $2,121 | $825 | Not Implemented |
BD0454 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,034 | $500 | Not Implemented |
BD0454 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,811 | $2,500 | Not Implemented |
BD0454 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $1,054 | $900 | Not Implemented |