IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0124 # 09 Y:1995 09 1995 REDUCE SCRAP PRODUCTION $3,333 $3,124 Not Implemented
UL0124 # 10 Y:1995 10 1995 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $77 $75 Not Implemented
UL0124 # 11 Y:1995 11 1995 RECYCLE CLEANING SOLVENT AND REUSE $-76 $89 Not Implemented
UM0024 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $460 Not Implemented
UM0024 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $8,303 Not Implemented
UM0024 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $696 $1,980 Not Implemented
WV0059 # 01 Y:1995 01 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,855 $3,000 Not Implemented
WV0059 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,147 $4,000 Implemented
WV0059 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $539 $280 Implemented
WV0059 # 04 Y:1995 04 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $208 $366 Not Implemented
TN0547 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $5,800 Implemented
TN0547 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $1,800 Not Implemented
TN0547 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $716 $468 Implemented
TN0547 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $98 Implemented
TN0547 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,135 $0 Not Implemented
SF0056 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $708 Implemented
SF0056 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,130 $4,400 Implemented
SF0056 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,070 $21,000 Not Implemented
SF0056 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,751 $250 Implemented
SF0056 # 05 Y:1995 05 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $87,599 $18,750 Implemented
SF0056 # 06 Y:1995 06 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $56,940 $140,000 Implemented
SF0056 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $791 $1,680 Implemented
SF0056 # 08 Y:1995 08 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $194,002 $547,100 Not Implemented
SF0056 # 09 Y:1995 09 1995 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $29,556 $3,040 Implemented
SF0056 # 10 Y:1995 10 1995 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $1,680 $3,546 Implemented