IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0228 # 10 Y:1998 10 1998 USE A DIFFERENT OR RECYCLED RAW MATERIAL $2,075 $0 Not Implemented
UM0116 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $364 $980 Not Implemented
UM0116 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $663 $2,419 Implemented
UM0116 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $1,200 Implemented
UM0116 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $19,654 $4,350 Implemented
UM0116 # 05 Y:1998 05 1998 METER WASTE WATER $1,447 $150 Implemented
UM0116 # 06 Y:1998 06 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $28,299 $0 Not Implemented
UM0116 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $2,565 $0 Implemented
UM0115 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $204 $303 Implemented
UM0115 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $6,186 Not Implemented
UM0115 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $888 $804 Implemented
UM0115 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $600 Not Implemented
UM0115 # 05 Y:1998 05 1998 RECOVER AND REUSE WASTE MATERIAL $1,040 $500 Implemented
UM0115 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $510 $0 Implemented
UM0115 # 07 Y:1998 07 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $7,650 $1,500 Implemented
UD0544 # 01 Y:1998 01 1998 USE MORE EFFICIENT ADHESIVE APPLICATORS $15,189 $500 Implemented
UD0544 # 02 Y:1998 02 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,720 $800 Not Implemented
UD0544 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $8,392 $0 Implemented
UD0544 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,427 $1,000 Implemented
UD0544 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,145 $1,000 Implemented
UD0544 # 06 Y:1998 06 1998 REPAIR FAULTY LOUVERS AND DAMPERS $2,092 $400 Implemented
UD0544 # 07 Y:1998 07 1998 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $2,054 $0 Implemented
UD0544 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,695 $3,472 Not Implemented
UD0544 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $922 $700 Implemented
UD0544 # 10 Y:1998 10 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $769 $0 Implemented