IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0370 # 07 Y:2000 07 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,297 $1,410 Not Implemented
WI0370 # 08 Y:2000 08 2000 INSTALL OCCUPANCY SENSORS $669 $450 Not Implemented
WI0370 # 09 Y:2000 09 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $627 $500 Not Implemented
SF0188 # 01 Y:2000 01 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,117 $2,000 Not Implemented
SF0188 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,374 $1,180 Not Implemented
SF0188 # 03 Y:2000 03 2000 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,040 $4,040 Not Implemented
SF0188 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $5,490 Not Implemented
SF0188 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $3,301 $0 Not Implemented
SF0188 # 06 Y:2000 06 2000 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $42,287 $34,300 Not Implemented
MA0461 # 01 Y:2000 01 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,869 $768 Implemented
MA0461 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,834 $18,630 Implemented
MA0461 # 03 Y:2000 03 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,117 $128,000 Not Implemented
MA0461 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,838 $30,000 Implemented
MA0461 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,501 $1,630 Implemented
MA0461 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,272 $0 Implemented
MA0461 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $848 $0 Implemented
AS0275 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $367 $380 Not Implemented
AS0275 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,665 $2,256 Not Implemented
AS0275 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $544 Not Implemented
AS0275 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $981 $272 Not Implemented
AS0275 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,017 $120 Not Implemented
AS0275 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $588 $60 Not Implemented
AS0275 # 07 Y:2000 07 2000 $52,500 $16,000 Not Implemented
MA0459 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,945 $7,695 Not Implemented
MA0459 # 02 Y:2000 02 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,064 $150 Implemented