IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0151 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $375 $400 Implemented
HO0151 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,900 $6,500 Not Implemented
HO0151 # 04 Y:1997 04 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $31,200 $5,400 Not Implemented
HO0150 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,148 $31,658 Not Implemented
HO0150 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $791 $700 Implemented
HO0150 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $413 $310 Implemented
HO0150 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,566 $60 Not Implemented
HO0150 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,000 $6,500 Not Implemented
HO0150 # 06 Y:1997 06 1997 REDUCE HEAT GAIN BY WINDOW TINTING $5,161 $7,590 Not Implemented
HO0150 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,238 $20,020 Not Implemented
HO0150 # 08 Y:1997 08 1997 USE RADIANT HEATER FOR SPOT HEATING $956 $3,000 Implemented
HO0150 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $390 $100 Implemented
HO0149 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,800 $33,870 Not Implemented
HO0149 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $358 Not Implemented
HO0149 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $367 $400 Not Implemented
HO0149 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $620 $444 Not Implemented
HO0149 # 05 Y:1997 05 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $8,160 $35,000 Not Implemented
HO0149 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $968 $750 Not Implemented
HO0149 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,500 $0 Not Implemented
HO0149 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $400 $500 Not Implemented
HO0148 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,488 $2,196 Implemented
HO0148 # 02 Y:1997 02 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,600 $250 Implemented
HO0148 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $9,425 $5,000 Implemented
HO0148 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $572 $370 Not Implemented
HO0148 # 05 Y:1997 05 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,408 $2,000 Not Implemented