IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0291 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,235 $25,190 Implemented
UF0291 # 08 Y:2002 08 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $17,341 $2,600 Not Implemented
UF0291 # 09 Y:2002 09 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,394 $20,000 Not Implemented
UF0291 # 10 Y:2002 10 2002 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $16,158 $0 Not Implemented
UF0291 # 11 Y:2002 11 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $4,387 $0 Implemented
UF0291 # 12 Y:2002 12 2002 METER WASTE WATER $4,133 $1,500 Implemented
UF0291 # 13 Y:2002 13 2002 $2,309 $8,820 Not Implemented
UF0291 # 14 Y:2002 14 2002 $12,120 $16,900 Not Implemented
MS0201 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,647 $9,315 Not Implemented
MS0201 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,640 $145,111 Not Implemented
MS0201 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,132 $35,712 Not Implemented
MS0201 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,267 $340 Not Implemented
MS0201 # 05 Y:2002 05 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,593 $1,063 Not Implemented
WV0233 # 01 Y:2002 01 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,670 $1,375 Implemented
WV0233 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,719 $624 Not Implemented
WV0233 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,145 $7,000 Not Implemented
WV0233 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $988 $272 Implemented
WV0233 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,409 $3,500 Not Implemented
WV0233 # 06 Y:2002 06 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $616 $720 Implemented
WV0233 # 07 Y:2002 07 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,395 $1,590 Implemented
WV0233 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,333 $900 Implemented
WV0233 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $3,539 $750 Not Implemented
WV0233 # 10 Y:2002 10 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,934 $1,800 Implemented
WV0233 # 11 Y:2002 11 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $934 $50 Implemented
WV0233 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,023 $10,350 Implemented