IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0375 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $880 $900 Not Implemented
AS0375 # 03 Y:2004 03 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,797 $26,415 Not Implemented
AS0375 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $468 $737 Implemented
AS0375 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $60 Implemented
AS0375 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,132 $30 Implemented
LE0183 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $54,350 $390,000 n/a
LE0183 # 02 Y:2004 02 2004 REPAIR OR REPLACE STEAM TRAPS $49,237 $10,000 Implemented
LE0183 # 03 Y:2004 03 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,090 $7,000 Not Implemented
LE0183 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,113 $2,497 Not Implemented
LE0183 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,591 $750 Not Implemented
LE0183 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,467 $500 Not Implemented
LE0183 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,086 $21,041 Not Implemented
WV0286 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,216 $7,012 Not Implemented
WV0286 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $4,469 $3,580 Implemented
WV0286 # 03 Y:2004 03 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,072 $360 Implemented
WV0286 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,971 $250 Implemented
WV0286 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,455 $1,770 Implemented
WV0286 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,353 $251 Implemented
WV0286 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $1,083 $375 Not Implemented
WV0286 # 08 Y:2004 08 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $993 $1,000 Not Implemented
WV0286 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $0 Implemented
WV0286 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $828 $283 Implemented
WV0286 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $1,100 Implemented
WV0286 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $250 Implemented
WV0285 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $12,938 $1 Implemented