Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0308 # 04 Y:2005 | 04 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $13,767 | $6,500 | Implemented |
NC0308 # 05 Y:2005 | 05 | 2005 | ADOPT IN-HOUSE MATERIAL GENERATION | $3,600 | $4,000 | Not Implemented |
NC0308 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $1,493 | $2,000 | Implemented |
NC0308 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $867 | $750 | Implemented |
NC0308 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $338 | $160 | Implemented |
UU0080 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,095 | $3,040 | Not Implemented |
UU0080 # 02 Y:2005 | 02 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $5,900 | $0 | Not Implemented |
UU0080 # 03 Y:2005 | 03 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $681 | $2,276 | Not Implemented |
UU0080 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,294 | $70,000 | Not Implemented |
UU0080 # 05 Y:2005 | 05 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $6,535 | $0 | Not Implemented |
UM0274 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,936 | $135,000 | Not Implemented |
UM0274 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,622 | $2,000 | Not Implemented |
UM0274 # 03 Y:2005 | 03 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,242 | $0 | Implemented |
UM0274 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,966 | $200 | Not Implemented |
UM0274 # 05 Y:2005 | 05 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,699 | $700 | Not Implemented |
UM0274 # 06 Y:2005 | 06 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $791 | $2,000 | Not Implemented |
LM0089 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $380 | Implemented |
LM0089 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $163 | $0 | Not Implemented |
LM0089 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,655 | $4,550 | Not Implemented |
LM0089 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $368 | $150 | Not Implemented |
LM0089 # 05 Y:2005 | 05 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $26,400 | $0 | Implemented |
LM0089 # 06 Y:2005 | 06 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $7,090 | $800 | Implemented |
LE0205 # 01 Y:2005 | 01 | 2005 | INSTALL BACK-UP EQUIPMENT | $65,962 | $35,000 | Implemented |
LE0205 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,462 | $15,000 | Not Implemented |
LE0205 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $4,673 | $5,050 | Not Implemented |