Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0495 # 02 Y:2015 | 02 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $23,017 | $11,740 | Not Implemented |
SD0495 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,049 | $1,200 | Not Implemented |
SD0495 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,389 | $19,450 | Not Implemented |
SD0495 # 05 Y:2015 | 05 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,299 | $10,489 | Not Implemented |
SD0495 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $2,645 | $1,352 | Not Implemented |
SD0495 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,573 | $3,100 | Not Implemented |
SD0495 # 08 Y:2015 | 08 | 2015 | USE PHOTOCELL CONTROLS | $849 | $2,405 | Not Implemented |
SD0495 # 09 Y:2015 | 09 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $659 | $361 | Not Implemented |
SD0494 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $55,666 | $90,550 | Not Implemented |
SD0494 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $47,366 | $73,800 | Implemented |
SD0494 # 03 Y:2015 | 03 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $11,773 | $3,400 | Implemented |
SD0494 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,501 | $800 | Implemented |
SD0494 # 05 Y:2015 | 05 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,199 | $2,199 | Not Implemented |
MA0739 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,369 | $11,834 | Not Implemented |
MA0739 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,543 | $500 | Implemented |
MA0739 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $927 | $1,570 | Implemented |
MA0739 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $880 | $1,285 | Implemented |
MA0739 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $864 | $2,635 | Not Implemented |
MA0739 # 06 Y:2015 | 06 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $475 | $915 | Not Implemented |
MA0739 # 07 Y:2015 | 07 | 2015 | PAY UTILITY BILLS ON TIME | $426 | $500 | Implemented |
UD0918 # 01 Y:2015 | 01 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,159 | $700 | Not Implemented |
UD0918 # 02 Y:2015 | 02 | 2015 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,098 | $0 | Not Implemented |
UD0918 # 03 Y:2015 | 03 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $4,208 | $1,050 | Not Implemented |
UD0918 # 04 Y:2015 | 04 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $58,864 | $75,499 | Implemented |
UD0918 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,325 | $0 | Implemented |