Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,682
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0154 # 04 Y:2020 | 04 | 2020 | PAY UTILITY BILLS ON TIME | $1,563 | $0 | Implemented |
WM0154 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $599 | $1,500 | Implemented |
WM0154 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,228 | $1,500 | Implemented |
WM0154 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,436 | $3,500 | Implemented |
WM0154 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,697 | $2,500 | Not Implemented |
WM0154 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,376 | $54,000 | Implemented |
WM0154 # 01 Y:2020 | 01 | 2020 | REPLACE BOILER | $58,212 | $300,000 | Not Implemented |
IC0234 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,669 | $32,097 | Implemented |
IC0234 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,418 | $1,107 | Implemented |
IC0234 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,059 | $3,380 | Implemented |
IC0234 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,075 | $3,800 | Implemented |
IC0232 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,992 | $2,233 | Not Implemented |
IC0232 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $10,592 | $3,287 | Not Implemented |
IC0232 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,953 | $2,750 | Not Implemented |
IC0232 # 04 Y:2020 | 04 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $27,487 | $3,700 | Not Implemented |
IC0229 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,396 | $4,200 | Implemented |
IC0229 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $1,024 | $1,131 | Implemented |
IC0229 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,701 | $2,326 | Implemented |
IC0229 # 04 Y:2019 | 04 | 2019 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $2,133 | $2,010 | Implemented |
IC0229 # 05 Y:2019 | 05 | 2019 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $20,792 | $12,047 | Not Implemented |
IC0229 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,286 | $15,316 | Implemented |
IC0226 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $919 | $689 | Not Implemented |
IC0226 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,608 | $4,300 | Not Implemented |
IC0226 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,094 | $167 | Not Implemented |
IC0226 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $343 | $1,200 | Not Implemented |