IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0142 # 15 Y:1984 15 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,590 $0 Not Implemented
KU0142 # 16 Y:1984 16 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,606 $0 Implemented
KU0142 # 17 Y:1984 17 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $292 $400 Not Implemented
KU0142 # 18 Y:1984 18 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $108 $62 Not Implemented
KU0142 # 19 Y:1984 19 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
KU0143 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,486 $0 Implemented
KU0143 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,840 $0 Implemented
KU0143 # 03 Y:1984 03 1984 IMPROVE LUBRICATION PRACTICES $3,966 $0 Not Implemented
KU0143 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,586 $3,000 Implemented
KU0143 # 05 Y:1984 05 1984 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,141 $2,000 Implemented
KU0143 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $650 Not Implemented
KU0143 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,043 $1,200 Not Implemented
KU0143 # 08 Y:1984 08 1984 INSULATE BARE EQUIPMENT $755 $500 Not Implemented
KU0143 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $663 $1,200 Not Implemented
KU0143 # 10 Y:1984 10 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $620 $920 Implemented
KU0143 # 11 Y:1984 11 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $548 $0 Not Implemented
KU0143 # 12 Y:1984 12 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $300 Not Implemented
KU0143 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $183 $0 Implemented
KU0144 # 01 Y:1984 01 1984 REDUCE VENTILATION AIR $11,229 $0 Not Implemented
KU0144 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,395 $4,000 Implemented
KU0144 # 03 Y:1984 03 1984 IMPROVE LUBRICATION PRACTICES $1,597 $0 Implemented
KU0144 # 04 Y:1984 04 1984 INSTALL AUTOMATIC STACK DAMPER $2,157 $1,900 Not Implemented
KU0144 # 05 Y:1984 05 1984 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,578 $0 Implemented
KU0144 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,279 $39 Implemented
KU0144 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $160 $0 Implemented