IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0400 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $450 $0 Not Implemented
CO0400 # 06 Y:1997 06 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,100 $1,800 Implemented
IA0180 # 01 Y:1997 01 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $45,671 $8,400 Not Implemented
IA0180 # 02 Y:1997 02 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,858 $2,000 Not Implemented
IA0180 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,423 $992 Implemented
IA0180 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $4,378 Not Implemented
IA0180 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $443 $400 Not Implemented
IA0180 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $699 $931 Not Implemented
IA0180 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $292 Implemented
IA0180 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $175 $130 Implemented
SD0185 # 01 Y:1997 01 1997 USE OPTIMUM THICKNESS INSULATION $11,371 $2,170 Not Implemented
SD0185 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $4,451 $3,200 Not Implemented
SD0185 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,591 $1,830 Not Implemented
SD0185 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $820 $1,500 Not Implemented
SD0185 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $2,025 Implemented
SD0185 # 06 Y:1997 06 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $806 $1,030 Implemented
SD0185 # 07 Y:1997 07 1997 USE ULTRASONIC CLEANING $53,556 $1,140 Implemented
SD0185 # 08 Y:1997 08 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $53,325 $0 Implemented
SD0185 # 09 Y:1997 09 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,900 $8,500 Not Implemented
NC0130 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $513 $448 Not Implemented
NC0130 # 02 Y:1997 02 1997 DISCONNECT BALLASTS $474 $750 Not Implemented
NC0130 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,610 $2,650 Not Implemented
NC0130 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,182 $1,400 Not Implemented
NC0130 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $759 $700 Not Implemented
NC0130 # 06 Y:1997 06 1997 REPAIR AND ELIMINATE STEAM LEAKS $72,505 $200 Not Implemented