IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0361 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,278 $17,214 Implemented
MI0361 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $5,773 $9,476 Not Implemented
MI0361 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,612 $160 Implemented
MI0361 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,880 $1,446 Not Implemented
MI0361 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
OK1019 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,691 $0 Not Implemented
OK1019 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,794 $13,616 Not Implemented
OK1019 # 03 Y:2019 03 2019 USE POWER DURING OFF-PEAK PERIODS $4,239 $0 Implemented
OK1019 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $4,075 Implemented
UF0541 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $365,719 $1,800,000 Implemented
UF0541 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,964 $16,606 Implemented
UF0541 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,041 $3,368 Implemented
UF0541 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $11,463 $2,551 Implemented
UF0541 # 05 Y:2019 05 2019 INSTALL TURBULATORS $5,920 $7,500 Not Implemented
UF0541 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,871 $1,550 Implemented
UF0540 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $128,693 $34,812 Implemented
UF0540 # 02 Y:2019 02 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $99,716 $392,375 Implemented
UF0540 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,477 $20,256 Implemented
UF0540 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $32,246 $1,280 Implemented
UF0540 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,996 $0 Implemented
UF0540 # 06 Y:2019 06 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $18,214 $25,600 Implemented
WM0144 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,876 $6,000 Not Implemented
WM0144 # 02 Y:2019 02 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,063 $148,245 Not Implemented
WM0144 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,011 $0 Not Implemented
WM0144 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,839 $37,265 Not Implemented