IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0270 # 10 Y:1997 10 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $765 $982 Not Implemented
ND0270 # 11 Y:1997 11 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $72 $0 Not Implemented
ND0270 # 12 Y:1997 12 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $109 $0 Not Implemented
ND0269 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $144,546 $20,000 Implemented
ND0269 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $61,578 $49,200 Not Implemented
ND0269 # 03 Y:1997 03 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,574 $315 Not Implemented
ND0269 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,446 $400 Not Implemented
ND0269 # 05 Y:1997 05 1997 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $909 $30 Not Implemented
ND0269 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $791 $300 Not Implemented
ND0269 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $718 $600 Not Implemented
ND0269 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $536 $250 Not Implemented
ND0269 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $171 $495 Not Implemented
SD0169 # 01 Y:1997 01 1997 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,154 $3,300 Implemented
SD0169 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,714 $11,700 Implemented
SD0169 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,459 $0 Implemented
SD0169 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $469 Implemented
SD0169 # 05 Y:1997 05 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $1,809 $4,110 Implemented
SD0169 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,082 $1,845 Implemented
SD0169 # 07 Y:1997 07 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $1,894 $0 Not Implemented
SD0169 # 08 Y:1997 08 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $11,496 $3,480 Implemented
SD0169 # 09 Y:1997 09 1997 CHANGE PRODUCT SPECS $39,867 $0 Not Implemented
ME0215 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $9,522 $18,574 Not Implemented
ME0215 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,349 $979 Not Implemented
ME0215 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,413 $9,426 Not Implemented
ME0215 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,285 $330 Implemented