IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0460 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $166,400 $40,000 Implemented
CO0460 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,730 $122,000 Implemented
WI0369 # 01 Y:2000 01 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $4,974 $12,000 Not Implemented
WI0369 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,760 $1,200 Implemented
WI0369 # 03 Y:2000 03 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,942 $6,524 Not Implemented
WI0369 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $1,445 $1,858 Not Implemented
WI0369 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $392 $1,103 Not Implemented
WI0369 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,146 $5,097 Not Implemented
WI0369 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Implemented
WI0369 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $556 $640 Not Implemented
SF0187 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,271 $0 Implemented
SF0187 # 02 Y:2000 02 2000 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $1,393 $0 Implemented
SF0187 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,336 $1,446 Implemented
SF0187 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $360 $370 Implemented
SF0187 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,236 $2,040 Implemented
SF0187 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $851 $2,250 Implemented
SF0187 # 07 Y:2000 07 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,569 $4,392 Implemented
SF0187 # 08 Y:2000 08 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $7,099 $32,250 Implemented
SF0187 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,849 $10,470 Implemented
SF0187 # 10 Y:2000 10 2000 RECOVER AND REUSE WASTE MATERIAL $1,085 $0 Implemented
SF0187 # 11 Y:2000 11 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,250 $150 Implemented
SF0187 # 12 Y:2000 12 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $3,564 $5,500 Implemented
SF0187 # 13 Y:2000 13 2000 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME $4,155 $19,400 Not Implemented
TP0014 # 01 Y:2000 01 2000 RECOVER AND REUSE WASTE MATERIAL $12,967 $0 Not Implemented
TP0014 # 02 Y:2000 02 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $3,047 $96 Not Implemented