Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0317 # 06 Y:2002 | 06 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,358 | $176 | n/a |
AS0317 # 07 Y:2002 | 07 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $222 | $60 | n/a |
LM0024 # 01 Y:2002 | 01 | 2002 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $7,010 | $2,500 | Implemented |
LM0024 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,154 | $3,000 | Implemented |
LM0024 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,155 | $0 | Implemented |
LM0024 # 04 Y:2002 | 04 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,312 | $1,600 | Not Implemented |
LM0024 # 05 Y:2002 | 05 | 2002 | CLEAR AND RENT EXISTING SPACE | $110,000 | $4,500 | Implemented |
LM0024 # 06 Y:2002 | 06 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $237,600 | $0 | Implemented |
LM0024 # 07 Y:2002 | 07 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $166,320 | $100,000 | Not Implemented |
LM0024 # 08 Y:2002 | 08 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $47,320 | $0 | Not Implemented |
AM0410 # 01 Y:2002 | 01 | 2002 | REDUCE EXCESS STEAM BLEEDING | $122,870 | $40,000 | Not Implemented |
AM0410 # 02 Y:2002 | 02 | 2002 | REPAIR OR REPLACE STEAM TRAPS | $22,100 | $580 | Implemented |
AM0410 # 03 Y:2002 | 03 | 2002 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,240 | $4,120 | Not Implemented |
AM0410 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $5,060 | $1,120 | Implemented |
AM0410 # 05 Y:2002 | 05 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $980 | $250 | Implemented |
AM0410 # 06 Y:2002 | 06 | 2002 | USE SYNTHETIC LUBRICANT | $1,400 | $0 | Not Implemented |
AM0410 # 07 Y:2002 | 07 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $420 | $0 | Implemented |
GT0725 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $43,102 | $10,500 | Implemented |
GT0725 # 02 Y:2002 | 02 | 2002 | INSTALL SYSTEM TO COLLECT SCRAP | $540,000 | $192,000 | Not Implemented |
GT0725 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,758 | $0 | Not Implemented |
GT0725 # 04 Y:2002 | 04 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,446 | $2,550 | Implemented |
GT0725 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,185 | $35,000 | Not Implemented |
GT0725 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,301 | $10,007 | Implemented |
GT0725 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,114 | $400 | Implemented |
GT0725 # 08 Y:2002 | 08 | 2002 | FILTER AND REUSE HYDRAULIC OIL | $1,900 | $0 | Implemented |