Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0024 # 07 Y:1994 | 07 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,700 | $0 | Not Implemented |
NC0024 # 08 Y:1994 | 08 | 1994 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $15,127 | $25,000 | Not Implemented |
NC0023 # 07 Y:1994 | 07 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $297 | $97 | Not Implemented |
NC0023 # 01 Y:1994 | 01 | 1994 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,130 | $0 | Not Implemented |
NC0023 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $385 | $770 | Implemented |
NC0023 # 03 Y:1994 | 03 | 1994 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,610 | $7,500 | Not Implemented |
NC0023 # 04 Y:1994 | 04 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $122,824 | $35,000 | Not Implemented |
NC0023 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $72,336 | $30,000 | Not Implemented |
NC0023 # 06 Y:1994 | 06 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $148,485 | $65,000 | Not Implemented |
NC0022 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,088 | $90 | Implemented |
NC0022 # 02 Y:1994 | 02 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $309 | $10 | Implemented |
NC0022 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,432 | $1,592 | Implemented |
NC0022 # 04 Y:1994 | 04 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,119 | $9,280 | Not Implemented |
NC0022 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $145 | $500 | Not Implemented |
TN0513 # 01 Y:1994 | 01 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $7,632 | $3,500 | Not Implemented |
TN0513 # 02 Y:1994 | 02 | 1994 | CLOSE OFF UNNEEDED STEAM LINES | $1,428 | $0 | Implemented |
TN0513 # 03 Y:1994 | 03 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,733 | $0 | Not Implemented |
TN0513 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,076 | $3,350 | Not Implemented |
TN0513 # 05 Y:1994 | 05 | 1994 | INSULATE BARE EQUIPMENT | $168 | $95 | Implemented |
TN0513 # 06 Y:1994 | 06 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $638 | $480 | Implemented |
TN0513 # 07 Y:1994 | 07 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $431 | $1,300 | Not Implemented |
TN0513 # 08 Y:1994 | 08 | 1994 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $338 | $570 | Not Implemented |
TN0513 # 09 Y:1994 | 09 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $319 | $120 | Not Implemented |
TN0513 # 10 Y:1994 | 10 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $263 | $0 | Implemented |
TN0513 # 11 Y:1994 | 11 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $470 | Not Implemented |