IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0584 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $36,437 $43,540 Implemented
TN0584 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $13,037 $0 Implemented
TN0584 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,580 $6,920 Implemented
TN0584 # 07 Y:1996 07 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,057 $38,920 Implemented
TN0584 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,400 $0 Not Implemented
TN0584 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,050 $4,900 Implemented
TN0584 # 10 Y:1996 10 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,032 $0 Implemented
UD0489 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $2,203 $3,000 Not Implemented
UD0489 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,117 $15,000 Implemented
UD0489 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,445 $10,800 Implemented
UD0489 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $100 Implemented
UD0489 # 05 Y:1996 05 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,008 $400 Not Implemented
UD0489 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,457 $1,000 Not Implemented
TN0584 # 01 Y:1996 01 1996 PREHEAT COMBUSTION AIR WITH WASTE HEAT $63,310 $13,760 Implemented
TN0584 # 02 Y:1996 02 1996 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $49,571 $0 Implemented
CO0362 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,000 $1,950 Not Implemented
CO0362 # 02 Y:1996 02 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,260 $1,000 Not Implemented
CO0362 # 03 Y:1996 03 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,070 $1,400 Not Implemented
CO0362 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $188 Not Implemented
CO0362 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $380 $650 Implemented
CO0363 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,800 $14,040 Not Implemented
CO0363 # 02 Y:1996 02 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,360 $1,560 Not Implemented
CO0363 # 03 Y:1996 03 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,730 $1,350 Not Implemented
CO0363 # 04 Y:1996 04 1996 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $2,310 $11,720 Not Implemented
CO0363 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $2,458 Implemented