IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0321 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,825 $600 Implemented
AM0321 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,630 $40 Not Implemented
AM0321 # 04 Y:1998 04 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,470 $0 Not Implemented
AM0321 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $920 $170 Implemented
AM0321 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $100 Implemented
AM0321 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $220 Not Implemented
AM0321 # 08 Y:1998 08 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $320 $0 Not Implemented
AR0135 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $30,801 $21,375 Implemented
AR0135 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $1,312 Implemented
AR0135 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,070 $160 Implemented
AR0135 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $0 Implemented
AR0135 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,294 $28,500 Not Implemented
AR0135 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,028 $117 Implemented
AR0135 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,448 $0 Implemented
AR0135 # 08 Y:1998 08 1998 INSTALL MAGAZINES FOR TEMPORARY STORAGE $9,000 $34,345 Not Implemented
OD0104 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,047 $8,241 Not Implemented
OD0104 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $809 $200 Not Implemented
OD0104 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $453 $98 Not Implemented
OD0104 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,445 $11,000 Not Implemented
OD0104 # 05 Y:1998 05 1998 USE SYNTHETIC LUBRICANT $270 $59 Not Implemented
OD0104 # 06 Y:1998 06 1998 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $2,145 $500 Not Implemented
UD0543 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $256,936 $100,000 Not Implemented
UD0543 # 02 Y:1998 02 1998 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING $45,731 $4,000 Implemented
UD0543 # 03 Y:1998 03 1998 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING $21,625 $4,000 Implemented
UD0543 # 04 Y:1998 04 1998 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING $6,584 $10,000 Implemented