Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0346 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,284 | $30 | Implemented |
AS0346 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,718 | $9,268 | Not Implemented |
AS0346 # 04 Y:2003 | 04 | 2003 | INSTALL SKYLIGHTS | $2,387 | $5,219 | Not Implemented |
AS0346 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,550 | $2,600 | n/a |
AS0346 # 06 Y:2003 | 06 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $121 | $0 | Implemented |
AS0346 # 07 Y:2003 | 07 | 2003 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $1,212 | $44 | Not Implemented |
LL0156 # 01 Y:2003 | 01 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $944,111 | $379,982 | Not Implemented |
LL0156 # 02 Y:2003 | 02 | 2003 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $918,298 | $3,111,056 | Not Implemented |
LL0156 # 03 Y:2003 | 03 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $847,706 | $1,220 | Implemented |
LL0156 # 04 Y:2003 | 04 | 2003 | OPERATE BOILERS ON HIGH FIRE SETTING | $103,102 | $0 | Not Implemented |
LL0156 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $49,634 | $3,890 | Implemented |
LL0156 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,003 | $5,479 | Implemented |
LL0156 # 07 Y:2003 | 07 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $343,385 | $3,840 | Implemented |
AM0432 # 01 Y:2003 | 01 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,800 | $500 | Implemented |
AM0432 # 02 Y:2003 | 02 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $12,670 | $560 | Implemented |
AM0432 # 03 Y:2003 | 03 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $9,300 | $940 | Implemented |
AM0432 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,680 | $4,300 | Implemented |
AM0432 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,380 | $500 | Implemented |
AM0432 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,000 | $7,400 | Not Implemented |
AM0432 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $315 | $190 | Not Implemented |
AM0432 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $765 | Not Implemented |
AM0432 # 09 Y:2003 | 09 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $220 | $50 | Implemented |
AM0432 # 10 Y:2003 | 10 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $213 | $0 | Implemented |
UD0663 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $82,700 | $234,000 | Not Implemented |
UD0663 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $64,670 | $0 | Implemented |