Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0280 # 05 Y:1989 | 05 | 1989 | INSTALL SET-BACK TIMERS | $272 | $0 | Implemented |
OK0280 # 06 Y:1989 | 06 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $499 | $602 | Implemented |
OK0276 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $417 | $180 | Not Implemented |
OK0276 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $543 | $0 | Implemented |
OK0276 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $647 | $1,650 | Not Implemented |
OK0276 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,157 | $541 | Implemented |
OK0276 # 05 Y:1989 | 05 | 1989 | OPTIMIZE PLANT POWER FACTOR | $845 | $1,100 | Not Implemented |
OK0276 # 06 Y:1989 | 06 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $142 | $366 | Implemented |
OK0276 # 07 Y:1989 | 07 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $275 | $0 | Implemented |
OK0276 # 08 Y:1989 | 08 | 1989 | INSULATE BARE EQUIPMENT | $248 | $437 | Implemented |
OK0277 # 01 Y:1989 | 01 | 1989 | INSULATE FEEDWATER TANK | $344 | $212 | Implemented |
OK0277 # 02 Y:1989 | 02 | 1989 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,470 | $775 | Not Implemented |
OK0277 # 03 Y:1989 | 03 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,198 | $1,500 | Implemented |
OK0277 # 04 Y:1989 | 04 | 1989 | OPTIMIZE PLANT POWER FACTOR | $1,069 | $3,000 | Not Implemented |
OK0277 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,135 | $18,000 | Not Implemented |
OK0277 # 06 Y:1989 | 06 | 1989 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,340 | $12,000 | Implemented |
OK0277 # 07 Y:1989 | 07 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $2,801 | $250 | Not Implemented |
OK0277 # 08 Y:1989 | 08 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,430 | $834 | Implemented |
OK0277 # 09 Y:1989 | 09 | 1989 | INSTALL SET-BACK TIMERS | $1,149 | $1,440 | Not Implemented |
OK0277 # 10 Y:1989 | 10 | 1989 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $10,418 | $3,100 | Not Implemented |
OK0274 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $544 | $350 | Implemented |
OK0274 # 02 Y:1989 | 02 | 1989 | INSULATE BARE EQUIPMENT | $6,510 | $1,958 | Not Implemented |
OK0274 # 03 Y:1989 | 03 | 1989 | INSULATE BARE EQUIPMENT | $23,241 | $3,556 | Implemented |
OK0274 # 04 Y:1989 | 04 | 1989 | COVER OPEN TANKS | $11,365 | $1,986 | Not Implemented |
OK0274 # 05 Y:1989 | 05 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,511 | $15,480 | Not Implemented |