IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0231 # 12 Y:2002 12 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $947 $3,000 Not Implemented
WV0231 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $6,000 Not Implemented
LM0026 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,166 $1,152 Implemented
LM0026 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $6,152 $4,400 Implemented
LM0026 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,384 $900 Implemented
LM0026 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $250 Implemented
LM0026 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,396 $0 Implemented
LM0026 # 06 Y:2002 06 2002 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $66,667 $0 Not Implemented
LM0026 # 07 Y:2002 07 2002 DEVELOP STANDARD OPERATING PROCEDURES $63,050 $12,200 Not Implemented
UM0208 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,164 $650 Implemented
UM0208 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,036 $10,015 Implemented
UM0208 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,158 $100 Implemented
UM0208 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $150 Implemented
MS0200 # 01 Y:2002 01 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $22,848 $50,000 Not Implemented
MS0200 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,783 $6,263 Not Implemented
MS0200 # 03 Y:2002 03 2002 USE SYNTHETIC LUBRICANT $1,196 $264 Not Implemented
MS0200 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $377 $236 Not Implemented
MS0200 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $248 $100 Not Implemented
MS0200 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $146 $248 Not Implemented
MS0200 # 07 Y:2002 07 2002 INSTALL TIMERS AND/OR THERMOSTATS $135 $236 Not Implemented
UM0207 # 01 Y:2002 01 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $119,000 $180,000 Not Implemented
UM0207 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,811 $3,150 Not Implemented
UM0207 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,268 $5,045 Not Implemented
UM0207 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,977 $1,000 Not Implemented
UM0207 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $450 Implemented