Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0663 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $36,762 | $87,200 | Not Implemented |
UD0663 # 04 Y:2003 | 04 | 2003 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $36,720 | $4,800 | Not Implemented |
UD0663 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,589 | $102,000 | Not Implemented |
UD0663 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $24,572 | $0 | Not Implemented |
UD0663 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,728 | $4,941 | Not Implemented |
UD0663 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $975 | Not Implemented |
UD0663 # 09 Y:2003 | 09 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,042 | $368 | Not Implemented |
UD0663 # 10 Y:2003 | 10 | 2003 | COVER OPEN TANKS | $760 | $1,870 | Not Implemented |
UU0039 # 01 Y:2003 | 01 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,610 | $9,000 | Implemented |
UU0039 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,754 | $600 | Implemented |
UU0039 # 03 Y:2003 | 03 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,286 | $1,085 | Implemented |
UU0039 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,929 | $300 | Not Implemented |
UU0039 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $1,012 | $832 | Not Implemented |
UU0039 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $703 | $237 | Implemented |
UU0039 # 07 Y:2003 | 07 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $199 | $660 | Implemented |
UU0039 # 08 Y:2003 | 08 | 2003 | OPTIMIZE PLANT POWER FACTOR | $695 | $695 | Implemented |
UU0039 # 09 Y:2003 | 09 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,608 | $0 | Implemented |
UU0039 # 10 Y:2003 | 10 | 2003 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $1,046 | $1,342 | Not Implemented |
WI0438 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,005 | $15,000 | Implemented |
WI0438 # 02 Y:2003 | 02 | 2003 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $4,455 | $5,000 | Implemented |
WI0438 # 03 Y:2003 | 03 | 2003 | IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION | $2,640 | $8,000 | Not Implemented |
WI0438 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,901 | $1,000 | Implemented |
WI0438 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,793 | $2,800 | Implemented |
WI0438 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $353 | $120 | Implemented |
WI0438 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $261 | $640 | Not Implemented |