IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0207 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $560 $634 Not Implemented
OK0633 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $552 Implemented
OK0633 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $351 $720 Not Implemented
OK0633 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,451 $2,995 Implemented
OK0633 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $35,173 Implemented
OK0633 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $94,595 $103,140 Implemented
OK0633 # 06 Y:2002 06 2002 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $276,478 $200,000 Not Implemented
OK0633 # 07 Y:2002 07 2002 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $752,359 $502,500 Implemented
OK0633 # 08 Y:2002 08 2002 USE RADIANT HEATER FOR SPOT HEATING $5,822 $11,440 Not Implemented
OK0633 # 09 Y:2002 09 2002 INSTALL SET-BACK TIMERS $6,660 $3,570 Implemented
UD0636 # 01 Y:2002 01 2002 INCREASE USE OF AUTOMATION $62,400 $0 Implemented
UD0636 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $20,587 $7,200 Implemented
UD0636 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,230 $25,000 Implemented
UD0636 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $4,987 $3,750 Implemented
UD0636 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,247 $500 Implemented
UD0636 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,668 $1,185 Implemented
UD0636 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $2,880 Implemented
UD0636 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,335 $420 Implemented
UD0636 # 09 Y:2002 09 2002 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,223 $0 Implemented
UD0636 # 10 Y:2002 10 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $736 $300 Implemented
UM0206 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $100,000 $5,000 Not Implemented
UM0206 # 02 Y:2002 02 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $39,500 $121,500 Not Implemented
UM0206 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,341 $105,000 Not Implemented
UM0206 # 04 Y:2002 04 2002 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $10,650 $26,000 Not Implemented
UM0206 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,767 $525 Not Implemented