IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0195 # 03 Y:1998 03 1998 UPGRADE CONTROLS ON COMPRESSORS $2,717 $5,000 Not Implemented
SD0195 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $993 $900 Not Implemented
SD0195 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,311 $0 Not Implemented
SD0195 # 06 Y:1998 06 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,157 $1,125 Not Implemented
SD0195 # 07 Y:1998 07 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $844 $2,865 Not Implemented
SD0195 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,268 $9,327 Implemented
SD0195 # 09 Y:1998 09 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,966 $3,120 Not Implemented
SD0195 # 10 Y:1998 10 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $338,670 $24,000 Not Implemented
SD0195 # 11 Y:1998 11 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,800 $1,200 Not Implemented
SD0195 # 12 Y:1998 12 1998 USE A RAG RECYCLE SERVICE $8,640 $200 Implemented
SD0195 # 13 Y:1998 13 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,375 $4,864 Not Implemented
AM0318 # 01 Y:1998 01 1998 USE OPTIMUM TEMPERATURE $11,790 $0 Implemented
AM0318 # 02 Y:1998 02 1998 PURCHASE EQUIPMENT INSTEAD OF LEASING $3,110 $5,400 Not Implemented
AM0318 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,430 $160 Implemented
AM0318 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $875 $0 Not Implemented
AM0318 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $840 $1,500 Implemented
AM0318 # 06 Y:1998 06 1998 INSTALL SKYLIGHTS $510 $1,860 Not Implemented
AM0318 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $420 $100 Implemented
AM0319 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $450 Not Implemented
AM0319 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,645 $900 Not Implemented
AM0319 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $5,110 $1,700 Not Implemented
AM0319 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,400 $30 Not Implemented
AM0319 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,960 $490 Not Implemented
AM0319 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $445 $405 Not Implemented
DS0112 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,447 $21,490 Implemented