IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,622

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0222 # 09 Y:2000 09 2000 RECYCLE CASTING SAND $5,475 $500 Implemented
HO0222 # 10 Y:2000 10 2000 METER WASTE WATER $902 $0 Implemented
HO0221 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,602 $27,210 Not Implemented
HO0221 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $554 $200 Implemented
HO0221 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,110 $7,590 Implemented
HO0221 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $0 Not Implemented
HO0221 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,721 $600 Implemented
HO0221 # 06 Y:2000 06 2000 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,845 $9,720 Implemented
HO0221 # 07 Y:2000 07 2000 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,176 $360 Not Implemented
HO0221 # 08 Y:2000 08 2000 $8,211 $1,160 Not Implemented
HO0221 # 09 Y:2000 09 2000 $1,200 $1,800 Not Implemented
HO0221 # 10 Y:2000 10 2000 $900 $60 Implemented
HO0211 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,520 $15,297 Implemented
HO0211 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $9,233 Implemented
HO0211 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $1,500 Implemented
HO0211 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $20 Implemented
HO0211 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $2,000 Implemented
HO0211 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $200 Implemented
HO0211 # 07 Y:1999 07 1999 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $969 $1,400 Not Implemented
HO0211 # 08 Y:1999 08 1999 USE COMPRESSOR AIR FILTERS $6,130 $150 Implemented
HO0211 # 09 Y:1999 09 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,690 $1,400 Not Implemented
HO0211 # 10 Y:1999 10 1999 $15,600 $480 Implemented
WV0178 # 01 Y:1999 01 1999 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,912 $0 Not Implemented
WV0178 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,919 $165 Implemented
WV0178 # 03 Y:1999 03 1999 DISCONNECT BALLASTS $16,730 $0 Implemented