IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0056 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $4,344 $701 n/a
OD0056 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154 $1,365 n/a
OD0056 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $269 $520 n/a
OD0056 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,815 $1,365 n/a
OD0056 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $320 n/a
OD0056 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,826 $8,120 n/a
ME0188 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $58,152 $127,000 Not Implemented
ME0188 # 02 Y:1996 02 1996 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $40,938 $4,108 Not Implemented
ME0188 # 03 Y:1996 03 1996 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $26,743 $600 Implemented
ME0188 # 04 Y:1996 04 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,452 $308 Implemented
ME0188 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,440 $18,689 Implemented
ME0188 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,521 $2,761 Implemented
ME0188 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $646 $1,118 Implemented
ME0188 # 08 Y:1996 08 1996 USE OPTIMUM TEMPERATURE $570 $530 Not Implemented
MO0170 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $1,107 Implemented
MO0170 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $2,944 Implemented
MO0170 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $0 Implemented
MO0170 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $219 $0 Implemented
MO0170 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,607 $4,540 Implemented
MO0170 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $789 $50 Implemented
MO0170 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $907 $206 Implemented
MO0170 # 08 Y:1996 08 1996 USE SYNTHETIC LUBRICANT $573 $88 Implemented
MO0170 # 09 Y:1996 09 1996 RECYCLE CLEANING SOLVENT AND REUSE $9,634 $7,700 Implemented
AM0274 # 01 Y:1996 01 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $18,652 $0 Not Implemented
AM0274 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $15,365 $9,000 Implemented