IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0515 # 01 Y:1997 01 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $36,109 $60,000 Implemented
UD0515 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,688 $11,020 Not Implemented
UD0515 # 03 Y:1997 03 1997 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $34,031 $25,000 Not Implemented
UD0515 # 04 Y:1997 04 1997 MOVE PRODUCT USING MECHANICAL MEANS $67,125 $2,500 Not Implemented
UD0515 # 05 Y:1997 05 1997 MOVE PRODUCT USING MECHANICAL MEANS $19,500 $8,000 Not Implemented
UD0515 # 06 Y:1997 06 1997 USE OTHER METHODS FOR NEUTRALIZATION $5,655 $500 Not Implemented
UD0515 # 07 Y:1997 07 1997 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,789 $200 Implemented
UD0515 # 08 Y:1997 08 1997 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,875 $0 Not Implemented
UD0515 # 09 Y:1997 09 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,143 $150,000 Implemented
WV0115 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,851 $13,131 Implemented
WV0115 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,817 $12,528 Implemented
WV0115 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,593 $360 Implemented
WV0115 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,381 $390 Not Implemented
WV0115 # 05 Y:1997 05 1997 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,203 $1,439 Not Implemented
WV0115 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,375 $9,320 Not Implemented
WV0115 # 07 Y:1997 07 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,639 $5,000 Implemented
WV0115 # 08 Y:1997 08 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,959 $9,600 Not Implemented
WV0115 # 09 Y:1997 09 1997 REDUCE VENTILATION AIR $9,993 $2,800 Not Implemented
WV0115 # 10 Y:1997 10 1997 RECOVER WASTE HEAT FROM EQUIPMENT $7,702 $1,725 Not Implemented
WV0115 # 11 Y:1997 11 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $17,100 $12,000 Not Implemented
WV0115 # 12 Y:1997 12 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,883 $200 Implemented
WV0115 # 13 Y:1997 13 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,000 $200 Implemented
WV0115 # 14 Y:1997 14 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $133,050 $10,000 Not Implemented
AM0296 # 01 Y:1997 01 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $9,900 $46,000 Not Implemented
AM0296 # 02 Y:1997 02 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,900 $990 Not Implemented