IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0153 # 11 Y:1997 11 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $4,738 $10,000 Not Implemented
MS0082 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $1,798 Not Implemented
MS0082 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,263 $7,718 Not Implemented
MS0082 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,945 $22,016 Not Implemented
MS0082 # 04 Y:1997 04 1997 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $46,250 $0 Implemented
MS0082 # 05 Y:1997 05 1997 SELL OIL TO RECYCLER $205 $0 Not Implemented
MS0082 # 06 Y:1997 06 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $33,600 $153,600 Not Implemented
MO0198 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $19,395 $15,000 Implemented
MO0198 # 02 Y:1997 02 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $7,440 $4,500 Implemented
MO0198 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,488 $10,000 Not Implemented
MO0198 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $5,544 Implemented
MO0198 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $1,790 Implemented
MO0198 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $0 Implemented
MO0198 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $243 $48 Implemented
MO0198 # 08 Y:1997 08 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $152 $40 Not Implemented
MO0198 # 09 Y:1997 09 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,582 $8,400 Not Implemented
MO0198 # 10 Y:1997 10 1997 RECOVER AND REUSE WASTE MATERIAL $276 $0 Implemented
MO0198 # 11 Y:1997 11 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $6,176 $18,000 Not Implemented
MA0391 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,296 $791 Not Implemented
MA0391 # 02 Y:1997 02 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,846 $900 Not Implemented
MA0391 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,321 $9,750 Not Implemented
MA0391 # 04 Y:1997 04 1997 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $4,656 $3,770 Not Implemented
MA0391 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,783 $4,225 Not Implemented
MA0391 # 06 Y:1997 06 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $947 $520 Not Implemented
MA0391 # 07 Y:1997 07 1997 INSTALL SET-BACK TIMERS $10,158 $30,560 Not Implemented