IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0871 # 10 Y:2023 10 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $525 $0 Implemented
LS2305 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $808 $90 Implemented
LS2305 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,419 $7,350 Implemented
LS2305 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $752 $900 Implemented
LS2305 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $2,315 Implemented
LT8366 # 01 Y:2023 01 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,618 $11,719 n/a
LT8366 # 02 Y:2023 02 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,157 $4,313 n/a
LT8366 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $18,863 $61,076 n/a
LE0540 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,565 $11,000 Not Implemented
LE0540 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $841 $1,040 Not Implemented
LE0540 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,247 $36,000 Not Implemented
LE0540 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,521 $9,000 Not Implemented
LE0540 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $1,080 $1,908 Not Implemented
LE0540 # 06 Y:2023 06 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,386 $45,000 Not Implemented
LE0540 # 07 Y:2023 07 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $128,214 $580,000 Not Implemented
MA0849 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $786,360 $8,384,740 Not Implemented
MA0849 # 02 Y:2023 02 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $53,317 $27,882 Not Implemented
MA0849 # 03 Y:2023 03 2023 USE HEAT PUMP FOR SPACE CONDITIONING $22,535 $8,016 Not Implemented
MA0849 # 04 Y:2023 04 2023 USE HEAT PUMP FOR SPACE CONDITIONING $9,331 $2,100 Not Implemented
MA0849 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $8,491 $10,020 Not Implemented
OR0765 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $9,863 $0 Implemented
OR0765 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,614 $0 Implemented
OR0765 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,784 $0 Implemented
OR0765 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,844 $24,853 Not Implemented
OK1085 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,249 $820,666 Not Implemented