Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,801
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0231 # 13 Y:2000 | 13 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $12,375 | $1,075 | Implemented |
HO0231 # 14 Y:2000 | 14 | 2000 | INSTALL CONTINUOUS LUBRICATION EQUIPMENT | $5,850 | $20,000 | Not Implemented |
HO0231 # 15 Y:2000 | 15 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,880 | $200 | Not Implemented |
HO0231 # 16 Y:2000 | 16 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,980 | $20,017 | Not Implemented |
HO0231 # 17 Y:2000 | 17 | 2000 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $79,092 | $7,100 | Implemented |
HO0231 # 18 Y:2000 | 18 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $7,809 | $2,360 | Implemented |
HO0231 # 19 Y:2000 | 19 | 2000 | TREAT AND REUSE RINSE WATERS | $4,617 | $10,100 | Not Implemented |
HO0229 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,928 | $20,007 | Not Implemented |
HO0229 # 02 Y:2000 | 02 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,032 | $700 | Not Implemented |
HO0229 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,524 | $240 | Not Implemented |
HO0229 # 04 Y:2000 | 04 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $140,367 | $106,000 | Not Implemented |
HO0229 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $68,250 | $500,000 | Not Implemented |
HO0229 # 06 Y:2000 | 06 | 2000 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $9,899 | $20,000 | Not Implemented |
HO0229 # 07 Y:2000 | 07 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $5,850 | $10,000 | Not Implemented |
HO0229 # 08 Y:2000 | 08 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $5,850 | $3,000 | Not Implemented |
HO0229 # 09 Y:2000 | 09 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,200 | $4,500 | Not Implemented |
HO0229 # 10 Y:2000 | 10 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $4,160 | $6,000 | Not Implemented |
HO0229 # 11 Y:2000 | 11 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $3,900 | $8,000 | Not Implemented |
HO0229 # 12 Y:2000 | 12 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,040 | $100 | Not Implemented |
HO0229 # 13 Y:2000 | 13 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $1,040 | $600 | Not Implemented |
HO0229 # 14 Y:2000 | 14 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $33,000 | $3,000 | Not Implemented |
WV0188 # 01 Y:2000 | 01 | 2000 | INSTALL SET-BACK TIMERS | $318 | $28 | Implemented |
WV0188 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $24 | $62 | Implemented |
WV0188 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $206 | $15 | Implemented |
WV0188 # 04 Y:2000 | 04 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $270 | $150 | Implemented |