IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0261 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,284 $80,602 Implemented
ME0261 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,535 $25,000 Implemented
ME0261 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,477 $7,909 Implemented
ME0261 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,134 $900 Implemented
ME0261 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,914 $11,200 Not Implemented
ME0261 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,704 $12,000 Implemented
ME0261 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,394 $3,080 Implemented
ME0261 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $1,053 $1,200 Implemented
ME0261 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $886 $200 Implemented
ME0261 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $788 $500 Implemented
ME0261 # 11 Y:1999 11 1999 DEVELOP A REPAIR/REPLACE POLICY $271 $325 Implemented
ME0261 # 12 Y:1999 12 1999 $29 $27 Implemented
CO0433 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,630 $1,400 Not Implemented
CO0433 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $600 Not Implemented
CO0433 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $441 $1,208 Not Implemented
CO0433 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $960 $0 Not Implemented
CO0433 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $420 Not Implemented
CO0433 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $340 $0 Not Implemented
CO0433 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $220 $20 Not Implemented
CO0433 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $71,760 $60,000 Not Implemented
IA0216 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,823 $236 Implemented
IA0216 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,677 $6,766 Implemented
IA0216 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,089 $50 Not Implemented
IA0216 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $657 $399 Not Implemented
IA0216 # 05 Y:1999 05 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $5,826 $7,750 Not Implemented