IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,907

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0295 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,497 $558 Implemented
IC0295 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,248 $0 Implemented
IC0295 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $7,539 Not Implemented
IC0295 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,221 $6,343 Not Implemented
IC0295 # 06 Y:2024 06 2024 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,247 $16,893 Not Implemented
IC0295 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $843 $490 Implemented
LE0557 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $279,544 $0 Implemented
LE0557 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $87,150 $3,000 Not Implemented
LE0557 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,494 $100 Implemented
LE0557 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,783 $9,500 Not Implemented
LE0557 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197,906 $323,780 Implemented
LE0557 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $291,977 $600,000 Not Implemented
LE0557 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,463 $29,000 Not Implemented
LE0557 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,250 $37,000 Not Implemented
UU0240 # 01 Y:2024 01 2024 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,047 $10,320 Not Implemented
UU0240 # 02 Y:2024 02 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $1,601 $7,755 Implemented
UU0240 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,286 $1,500 Implemented
UU0240 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $977 $113 Implemented
UU0240 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $1,387 Implemented
SF0613 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,003 $100 Implemented
SF0613 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,636 $2,272 Implemented
SF0613 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $16,386 $2,278 Implemented
SF0613 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,117 $3,083 Implemented
SF0613 # 05 Y:2024 05 2024 INSULATE FEEDWATER TANK $1,576 $1,977 Implemented
SF0613 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,170 Implemented