Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0751 # 01 Y:2003 | 01 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,286 | $450 | Not Implemented |
GT0751 # 02 Y:2003 | 02 | 2003 | ADJUST BURNERS FOR EFFICIENT OPERATION | $31,370 | $5,000 | Implemented |
GT0751 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,017 | $0 | Implemented |
GT0751 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $697 | $50 | Implemented |
GT0751 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $54,294 | $54,294 | n/a |
GT0751 # 06 Y:2003 | 06 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $133,000 | $622,000 | Not Implemented |
GT0751 # 07 Y:2003 | 07 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,433 | $111 | Not Implemented |
GT0751 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,580 | $12,000 | Implemented |
GT0751 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,221 | $11,587 | Implemented |
GT0751 # 10 Y:2003 | 10 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,690 | $72,250 | Implemented |
UM0226 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,808 | $16,880 | n/a |
UM0226 # 02 Y:2003 | 02 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $5,200 | $75 | Not Implemented |
UM0226 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,770 | $800 | Not Implemented |
UM0226 # 04 Y:2003 | 04 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,631 | $1,050 | Not Implemented |
UM0226 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,160 | $500 | Not Implemented |
UM0226 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,111 | $375 | Not Implemented |
UM0226 # 07 Y:2003 | 07 | 2003 | OPTIMIZE PLANT POWER FACTOR | $2,055 | $1,560 | Not Implemented |
UM0226 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,722 | $1,000 | Not Implemented |
UM0226 # 09 Y:2003 | 09 | 2003 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,207 | $600 | Not Implemented |
UM0226 # 10 Y:2003 | 10 | 2003 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $724 | $400 | Not Implemented |
UM0226 # 11 Y:2003 | 11 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,004 | $2,200 | Not Implemented |
UM0226 # 12 Y:2003 | 12 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $164 | $0 | Not Implemented |
AS0343 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,371 | $20,633 | Implemented |
AS0343 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $228 | $30 | Not Implemented |
AS0343 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,795 | $30 | Implemented |