IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0292 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,681 $12,153 Not Implemented
AS0292 # 05 Y:2001 05 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,330 $60 Not Implemented
AS0292 # 06 Y:2001 06 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,727 $60 Not Implemented
AS0292 # 07 Y:2001 07 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $156,400 $11,520 Not Implemented
AS0292 # 08 Y:2001 08 2001 LEASE EQUIPMENT INSTEAD OF PURCHASING $15,000 $1,200 Not Implemented
SD0262 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,244 $92,000 Not Implemented
SD0262 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,352 $179,000 Not Implemented
SD0262 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,419 $15,000 Not Implemented
SD0262 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,942 $300 Not Implemented
SD0262 # 05 Y:2001 05 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $38,254 $1,700 Not Implemented
SD0262 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $12,581 $5,200 Not Implemented
SD0262 # 07 Y:2001 07 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,738 $40,000 Not Implemented
SD0262 # 08 Y:2001 08 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,300 $7,900 Not Implemented
SD0262 # 09 Y:2001 09 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $22,032 $4,304 Not Implemented
SD0262 # 10 Y:2001 10 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $13,222 $4,800 Not Implemented
SD0262 # 11 Y:2001 11 2001 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $47,470 $72,000 Not Implemented
NC0207 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $423 $2,700 Not Implemented
NC0207 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,148 $750 Implemented
NC0207 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $16,705 $10,000 Implemented
NC0207 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,272 $12,600 Implemented
NC0207 # 05 Y:2001 05 2001 AIR CONDITION ONLY SPACE NECESSARY $13,400 $12,400 Implemented
UM0178 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,563 $900 Implemented
UM0178 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $400 $1,000 Not Implemented
UM0178 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,749 $73,500 n/a
UM0178 # 04 Y:2001 04 2001 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $19,408 $9,100 n/a