Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0384 # 04 Y:2001 | 04 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,980 | $20 | Not Implemented |
AM0384 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,395 | $20 | Implemented |
AM0384 # 06 Y:2001 | 06 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,330 | $800 | Not Implemented |
AM0384 # 07 Y:2001 | 07 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,200 | $7,500 | Not Implemented |
AM0384 # 08 Y:2001 | 08 | 2001 | PAY UTILITY BILLS ON TIME | $960 | $0 | Not Implemented |
AM0384 # 09 Y:2001 | 09 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $100 | $0 | Not Implemented |
UD0610 # 01 Y:2001 | 01 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $101,536 | $402,000 | Implemented |
UD0610 # 02 Y:2001 | 02 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $95,666 | $2,550 | Not Implemented |
UD0610 # 03 Y:2001 | 03 | 2001 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $28,005 | $12,000 | Not Implemented |
UD0610 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,646 | $1,500 | Not Implemented |
UD0610 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,232 | $0 | Not Implemented |
UD0610 # 06 Y:2001 | 06 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,028 | $0 | Not Implemented |
UD0610 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,984 | $6,000 | Implemented |
UD0610 # 08 Y:2001 | 08 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,387 | $500 | Not Implemented |
SF0206 # 01 Y:2001 | 01 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,884 | $475 | Not Implemented |
SF0206 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,007 | $7,832 | Not Implemented |
SF0206 # 03 Y:2001 | 03 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,881 | $2,910 | Not Implemented |
SF0206 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $668 | $600 | Implemented |
SF0206 # 05 Y:2001 | 05 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $332 | $500 | Not Implemented |
SF0206 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,381 | $24,410 | Not Implemented |
SF0206 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $4,060 | $22,250 | Implemented |
SF0206 # 08 Y:2001 | 08 | 2001 | USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME | $6,704 | $19,400 | Not Implemented |
MA0481 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $30,000 | Implemented |
MA0481 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,390 | $5,500 | Implemented |
MA0481 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,380 | $4,800 | Not Implemented |