IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0383 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $557 $980 Implemented
CO0383 # 03 Y:1997 03 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,770 $5,700 Not Implemented
CO0383 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $590 Implemented
CO0383 # 05 Y:1997 05 1997 RECOVER AND REUSE COOLING WATER $1,320 $1,580 Implemented
CO0383 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,120 $160 Not Implemented
CO0383 # 07 Y:1997 07 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $1,971,000 $100,000 Not Implemented
HO0152 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,638 $5,469 Not Implemented
HO0152 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $241 $245 Not Implemented
HO0152 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $482 $400 Not Implemented
HO0152 # 04 Y:1997 04 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,241 $6,000 Not Implemented
HO0152 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,832 $10,000 Not Implemented
HO0152 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,500 $6,500 Not Implemented
HO0152 # 07 Y:1997 07 1997 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $32,500 $6,000 Not Implemented
HO0152 # 08 Y:1997 08 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $3,963 $1,500 Not Implemented
MA0386 # 01 Y:1997 01 1997 USE OTHER METHODS FOR NEUTRALIZATION $194,188 $908,000 Not Implemented
MA0386 # 02 Y:1997 02 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $42,000 $0 Not Implemented
MA0386 # 03 Y:1997 03 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,024 $22,219 Not Implemented
MA0386 # 04 Y:1997 04 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,103 $20,180 Not Implemented
MA0386 # 05 Y:1997 05 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,800 $11,240 Not Implemented
MA0386 # 06 Y:1997 06 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,837 $3,215 Not Implemented
NC0110 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,602 $200 Implemented
NC0110 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $467 $240 Implemented
NC0110 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $363 $469 Implemented
NC0110 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,449 $1,160 Not Implemented
NC0110 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $101 $43 Not Implemented