IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0293 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $47,846 $2,000 n/a
WI0293 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $16,800 $4,000 n/a
WI0293 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $15,816 $1,400 n/a
WI0293 # 04 Y:1997 04 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,037 $500 n/a
WI0293 # 05 Y:1997 05 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,025 $3,544 n/a
WI0293 # 06 Y:1997 06 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $7,350 $4,000 n/a
WI0293 # 07 Y:1997 07 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,404 $0 n/a
WI0293 # 08 Y:1997 08 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,600 $0 n/a
WI0293 # 09 Y:1997 09 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $180 n/a
WI0293 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $1,280 n/a
WI0293 # 11 Y:1997 11 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,976 $8,000 n/a
WI0293 # 12 Y:1997 12 1997 MINIMIZE WATER USAGE $1,853 $0 n/a
WI0293 # 13 Y:1997 13 1997 $1,412 $0 n/a
WI0293 # 14 Y:1997 14 1997 INSTALL OCCUPANCY SENSORS $308 $225 n/a
MO0196 # 01 Y:1997 01 1997 $7,839 $15,000 Not Implemented
MO0196 # 02 Y:1997 02 1997 $4,725 $10,000 Implemented
MO0196 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,218 $4,096 Not Implemented
MO0196 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $1,583 Implemented
MO0196 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $0 Implemented
MO0196 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,497 $197 Implemented
MO0196 # 07 Y:1997 07 1997 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $4,550 $0 Not Implemented
MO0196 # 08 Y:1997 08 1997 RETURN SPENT SOLUTIONS TO THE MANUFACTURER $220 $0 Not Implemented
NC0110 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,602 $200 Implemented
NC0110 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $467 $240 Implemented
NC0110 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $363 $469 Implemented