IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0193 # 08 Y:1998 08 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $16,000 $10,000 Implemented
SD0193 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,200 $3,000 Implemented
SD0193 # 10 Y:1998 10 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $16,000 $4,000 Not Implemented
NV0100 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $150 Implemented
NV0100 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $233 $326 Implemented
NV0100 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,558 $1,890 Not Implemented
NV0100 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $135 Implemented
NV0100 # 05 Y:1998 05 1998 USE PHOTOCELL CONTROLS $2,667 $495 Implemented
NV0100 # 06 Y:1998 06 1998 UTILIZE OUTSIDE CONTRACTING $42,320 $25,000 Not Implemented
NC0155 # 01 Y:1998 01 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $109 $0 Not Implemented
NC0155 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,802 $700 Not Implemented
NC0155 # 03 Y:1998 03 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $441 $50 Not Implemented
NC0155 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $386 $0 Not Implemented
NC0155 # 05 Y:1998 05 1998 AIR CONDITION ONLY SPACE NECESSARY $3,045 $5,426 Not Implemented
NC0155 # 06 Y:1998 06 1998 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $15,130 $9,000 Not Implemented
NC0155 # 07 Y:1998 07 1998 CLEAR AND RENT EXISTING SPACE $50,000 $150,000 Not Implemented
OR0316 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $1,044 $6,400 Implemented
OR0316 # 02 Y:1998 02 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $13,730 $9,350 Not Implemented
OR0316 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $997 $2,560 Not Implemented
OR0316 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,025 $31,400 Not Implemented
OR0316 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,410 $0 Implemented
OR0316 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $813 $0 Implemented
OR0316 # 07 Y:1998 07 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,142 $4,167 Implemented
UD0539 # 01 Y:1998 01 1998 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,210 $3,000 Implemented
UD0539 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,296 $0 Implemented