Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0193 # 08 Y:1998 | 08 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $16,000 | $10,000 | Implemented |
SD0193 # 09 Y:1998 | 09 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $3,200 | $3,000 | Implemented |
SD0193 # 10 Y:1998 | 10 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $16,000 | $4,000 | Not Implemented |
NV0100 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $917 | $150 | Implemented |
NV0100 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $233 | $326 | Implemented |
NV0100 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,558 | $1,890 | Not Implemented |
NV0100 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $443 | $135 | Implemented |
NV0100 # 05 Y:1998 | 05 | 1998 | USE PHOTOCELL CONTROLS | $2,667 | $495 | Implemented |
NV0100 # 06 Y:1998 | 06 | 1998 | UTILIZE OUTSIDE CONTRACTING | $42,320 | $25,000 | Not Implemented |
NC0155 # 01 Y:1998 | 01 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $109 | $0 | Not Implemented |
NC0155 # 02 Y:1998 | 02 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,802 | $700 | Not Implemented |
NC0155 # 03 Y:1998 | 03 | 1998 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $441 | $50 | Not Implemented |
NC0155 # 04 Y:1998 | 04 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $386 | $0 | Not Implemented |
NC0155 # 05 Y:1998 | 05 | 1998 | AIR CONDITION ONLY SPACE NECESSARY | $3,045 | $5,426 | Not Implemented |
NC0155 # 06 Y:1998 | 06 | 1998 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $15,130 | $9,000 | Not Implemented |
NC0155 # 07 Y:1998 | 07 | 1998 | CLEAR AND RENT EXISTING SPACE | $50,000 | $150,000 | Not Implemented |
OR0316 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $1,044 | $6,400 | Implemented |
OR0316 # 02 Y:1998 | 02 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $13,730 | $9,350 | Not Implemented |
OR0316 # 03 Y:1998 | 03 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $997 | $2,560 | Not Implemented |
OR0316 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,025 | $31,400 | Not Implemented |
OR0316 # 05 Y:1998 | 05 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,410 | $0 | Implemented |
OR0316 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $813 | $0 | Implemented |
OR0316 # 07 Y:1998 | 07 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,142 | $4,167 | Implemented |
UD0539 # 01 Y:1998 | 01 | 1998 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,210 | $3,000 | Implemented |
UD0539 # 02 Y:1998 | 02 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,296 | $0 | Implemented |